Connecting a prefab home to power and water
How a finished prefab home gets connected to electricity, water and sewer or septic after delivery, and who does the work.
Arrives ready to connect
Alivance homes arrive pre-wired and pre-plumbed, with electrical built to your country's standard. There is no interior assembly.
Who connects it
A local licensed electrician connects the power, and a local licensed plumber connects water and sewer or septic. They know the local rules and inspections in your area.
What to share with your contractors
We send the home's electrical and plumbing details so your contractors can plan the connections before delivery day.
Support from us
You get our installation guide and remote support from our team while your local contractors connect the home.
Pick a model or start from a shell, choose every finish and walk inside your future home before you buy.
Start designing ↗
Reserve your homeFree AC + sofa, your CAD floor plan and your price locked for 6 months. The full $999 comes off your home price.
See how it works ↗- Price locked 6 months
- Free AC + sofa: 2 AC + sofa on 40 ft, 1 AC + sofa on 30 ft, 1 AC on 20 ft
- Priority build slot
- CAD floor plan and spec sheet
- 3 free design revisions
- Private home portal
Get your
delivered price.
Price and floor plans within 24 hours. No obligation.
