How your home arrives and gets set up
From the factory to your land, step by step. Turn the 3D model with your finger or mouse and follow each step.
Prepare a level foundation
Before delivery day, have a level foundation ready under where the home will sit. Choose the type that suits your land below.
A flat concrete slab, slightly larger than the home. Strong and simple for most sites.
Your checklist
- A level foundation: concrete slab, concrete piers, or blocks on a gravel pad
- Clear truck access at least 14 ft wide, with no low wires or branches
- A 15–20 ton crane and a forklift (2+ tons) booked for delivery day
- About 4 people on site
- A local licensed electrician and plumber for the final connections
What happens
- The truck arrives on the day we confirmed with you
- Unloading usually takes about 2 hours
- The truck allows 1 free hour on site, so have your crane and team ready when it arrives
- The crane sets the home on your foundation, squared and level
- Inspect the home and note any damage before the truck leaves
A tracking number for every step
Your home can have up to 5 tracking numbers. Each one appears on your order tracking page as soon as it is issued, and we email you at every stage.
Delivery questions
Who unloads the home?
Unloading is arranged by you on delivery day: a 15–20 ton crane, a forklift (2+ tons) and about 4 people. Most homes are off the truck and in place in about 2 hours.
How much notice do I get before delivery?
You get 1–2 weeks' notice of your delivery window, plus tracking numbers for every leg of the trip.
What foundation do I need?
A level foundation: a concrete slab, concrete piers, or concrete blocks on a compacted gravel pad.
What if the home is damaged in transit?
Note it on the delivery papers before the truck leaves and email photos to support@alivancehomes.com within 48 hours. Do not refuse the delivery.
Do you help with installation?
Yes. You get our full video installation guide and remote support from our team while your local contractors connect the home.